9000 Varna, Bulgaria
+359 52 636094; +359 52 401813
info@shipsurvey.org

Category: Sakarya

Marine Consultants and Offshore Engineers

Quiluma & Maboqueiro (Q&M) Project, Transportation and Installation of the Jackets for the WHPs using Sapura 3500

Attended on behalf of Global Maritime as MWS onboard the Sapura 3500 for installation of the Quiluma & Maboqueiro jackets using PLV Sapura 3500 for Azule Energy.

Sakarya Project, Phase 2A, 16” trunkline pipelay in WDs 38 to 2160m by PLV Castorone

Attended on behalf of Global Maritime as MWS onboard one of the world’s most advanced PLV Castorone for mobilization activities, calibration and load tests of PTS and PHS, DP annual trials and pipelay of 16″ trunkline in WDs 38 to 2160m, infield pipelines and PLETs installation.

Sakarya Project, Loadouts of PLETs, Reels, X-Tree and Installation of SDU and Manifold

Loadouts of PLETs, Reels, X-Tree and Installation of SDU and Manifold. Work performed obo DNV Noble Denton ms, Italy,

Sakarya Project, Installation of Steel Flying Leads

Installation of Steel Flying Leads from UTA to SDU by LCV Mukavemet on the Sakarya Project. Work performed obo DNV Noble Denton ms, Italy,